FCSF CONSTRUCTION - DAY FIFTY NINE
Sparks are flying(see second pic below) at the 500 Sansome space.
Construction is 60% percent complete.
Tony and his right hand karate specialist(see below) Peter are in full wiring mode.
They have manufactured "baloney tube" to run "a 1000 Base T
10 Giga Bit Infrastructure and 550 MHZ Video" using 3 inch conduit
to drive diagonal through the walls.
Asked when the wiring will be done Tony responded that you can
"...never really be done with wiring... just terminate the ends...it makes it more flexible."
The quote of the interview was this, "This place will have 550 megahertz of video.
And this place has put the MEGA HURT on me."
TIDY.
GO HERE FOR THE MICHAEL SEMBELLO
"MANIAC" VIDEO FOR FLASHDANCE.
OOHHH...CABLE TRAYS.
THE KARATE KID "CRANE" POSITION
Construction is 60% percent complete.
Tony and his right hand karate specialist(see below) Peter are in full wiring mode.
They have manufactured "baloney tube" to run "a 1000 Base T
10 Giga Bit Infrastructure and 550 MHZ Video" using 3 inch conduit
to drive diagonal through the walls.
Asked when the wiring will be done Tony responded that you can
"...never really be done with wiring... just terminate the ends...it makes it more flexible."
The quote of the interview was this, "This place will have 550 megahertz of video.
And this place has put the MEGA HURT on me."
TIDY.
GO HERE FOR THE MICHAEL SEMBELLO
"MANIAC" VIDEO FOR FLASHDANCE.
OOHHH...CABLE TRAYS.
THE KARATE KID "CRANE" POSITION